Industrial IoT

Your machines have data. Your team needs visibility.

Bring machine signals, quality data, and maintenance context together so operations teams can understand an event and choose what to do next.

Discuss your challenge↗
!MachineCollect dataSee status
Know which machine needs attention
01 / THE RIGHT FIT

When this is the right starting point

  • Teams walk the floor or record machine status manually
  • Downtime, quality, and maintenance data live in separate systems
  • You want to validate one machine or production line before expanding
ILLUSTRATIVE APPROACH · NOT A CUSTOMER CASE STUDY

From a machine stop to an actionable event

  1. 01

    Capture

    Select signals and timestamps. Check connection methods and sampling rates against equipment constraints.

  2. 02

    Add context

    Associate events with machines, shifts, or available work orders. Identify missing data explicitly.

  3. 03

    Follow up

    Show events and notify the responsible team. People verify causes and record actions.

AGREE ON MEASURES BEFORE STARTING

Event detection time / Reporting effort

02 / SCOPE & HANDOVER

What we deliver and review together

Define the scope around your systems and agree acceptance criteria before implementation.

  • Verified equipment, signal, and connection inventory
  • Role-based dashboards and agreed alert rules
  • Tests for missing data, timestamp differences, and reconnection
  • Maintenance guidance and acceptance evidence from the pilot
03 / BEFORE WE START

Bring the context that makes a good start

  • Equipment models and available data interfaces
  • Examples of existing reports or event logs
  • An operational owner and approved testing windows

Start with agreed read access. Machine commands and control-logic changes require a separate assessment and scope.

04 / COMMON QUESTIONS

Questions before getting started

Use these answers to frame an initial scope. Implementation, budget and timing depend on assessing your actual systems.

Have a question about your systems? Talk to the team →
Can KAOTOR assess a problem in an existing IoT system?

Start by reviewing symptoms, data points, networks and event records within approved access. Compare readings with the operational context to distinguish signal, timestamp and data-transfer issues, then agree remediation scope and acceptance checks. A cause or successful fix cannot be confirmed before inspecting the actual system.

What does industrial IoT development cover?

An agreed scope may include reading data from assessed equipment, gateway connections, status views and alerts, testing and operating instructions. Begin with one machine or process and agree data points, ownership and acceptance criteria. Machine-control work needs a separate assessment from data collection.

Should factory automation start with monitoring or machine control?

Start with the team's question and operational risks. Visibility may begin with read-only monitoring without changing control logic. Commands to equipment require a review of safety requirements, approval responsibilities and testing before scope is agreed. A dashboard does not establish readiness to control machines.

Can existing machines connect to Industrial IoT?

First check equipment models, data interfaces, protocols and available permissions. A gateway or additional sensors may be suitable for some machines, but compatibility cannot be confirmed without inspecting the actual equipment.

Will installation require a production shutdown?

This depends on the connection method and site requirements. We first assess read access without changing machine control. Hardware installation or configuration changes need an approved test window and owner; zero downtime is not assumed before assessment.

What data should an IoT pilot start with?

Start with one question, such as when a machine stops. Select the necessary machine state, timestamps and equipment IDs, then agree data ownership and completeness criteria. Validate one machine or production line before adding more signals.

How do we check whether the data is reliable?

Compare events with operational records and test timestamps, missing readings and reconnection. Make stale or missing data visible. A captured signal does not establish a stop cause; the responsible team must verify the context.

What determines the pilot budget and timeline?

Equipment count, data access, additional hardware, network constraints and acceptance criteria all affect the estimate. Agree a discovery scope before estimating delivery rather than applying a fixed price or timeline to an unassessed system.

How can our team maintain the system after the pilot?

Include operating instructions, the signal inventory, missing-data checks and named owners in the handover scope. Agree training, access permissions and ongoing support arrangements before work begins.

NEXT STEP

Start with one meaningful challenge

Share your current systems and desired outcome so we can define a focused pilot and success criteria.

Start a conversation↗